SERVICES TAILORED TO YOUR NEEDS - From design to execution

Our services

Delivering results, reliability, & rock solid dependability.

Whether occurring during a design-build project or as a primary step to perform repair or maintenance activities, lifting or handling heavy structures remains challenging. It demands control over the stresses induced in the structure throughout the whole process. Conducting such operations requires engineering expertise, reliable equipment, careful operating, and precise placement.

For Consultation? Call us

+91 9503186868

Planning the most complex lifts

We are leading service provider in the Steel and Forging, Power, Automobile, Civil, Petrochemical, Refinery, Ports, Railways, off-shore and On-shore industries in the Indian sub-continents in the following activities

Erection and Transportation

We possess unique expertise in handling the erection work.

Transportation and erection are related to the process of moving precast components to a building’s site and positioning them to form a structure.

RO - RO operation

Mudra have expertise in RO - RO operation take glance of our service.

“roll on, roll off”, the vehicle is driven into the transport vessel itself with other vehicles and secured to the deck. Unlike container shipping where the vehicle is placed in a container.

Road Survey

Our professional team is leading us in road survey work with proven expertise.

A road survey is a comprehensive assessment of road infrastructure that provides information about alignment, drainage, safety features, and road geometry.

Shutdown Planning

Like removal of old equipment’s like, exchangers, vessels, elbows, bellows, cyclones and columns and replaced with new ones.

A plant shutdown, also known as a turnaround or outage, is a planned and temporary interruption of operations to perform maintenance, repairs, inspections, or upgrades.

Crwal Crean

We handle construction of Power plant, Steel plant etc

It consists of an upper carriage mounted on a crawler-type undercarriage. The upper deck and attachments rotate 360º.

Hydrocarbon Sector

FCCU & DHDS, Isomerization, DHDT,CDU/VDU,Visbreaker Unit

The oil and gas industry has developed several methods for installing heavy equipment offshore, including lift barges and floatover installation.

Benifits

Why choose Mudra Heavy Lifts for your project

Over 15 years’ experience

In the most complex, small and large-scale operations

Time-saving operation

Reducing installation activities on the critical path

Reduced site interferences

Few interferences with other site activities until the structure is moved and installed in its final position

Extensive service offering

From concept design to implementation

Reduce traffic disruption

Minimize disturbance as structures are built next to the traffic line and moved to the final position during a very short track closure

Exclusive technologies

State-of-the-art Hebetec hydraulic equipment and Megasteel® temporary structures

Construction Support

Like removal of old equipment like, exchangers, vessels, elbows, bellows, cyclones, and columns and replaced with new ones.

Deep Sea Consignments

Receiving of consignments in the deep sea from mother vessel to barges and from barges to jetty by roll on roll off method .

Handling hydraulic axles and Transportation

We possess unique expertise in handling hydraulic axles and road transportation of the equipment.

Manpower supplier

Manpower supplier-like Rigging foreman, Riggers, helpers, gas cutters and Mw fitters.

Projects

we appreciate that the planning for every day lifting and transport operations, frequently overlooked and disrespected.

92 mtr. dia. x 20 mtr. Height Crude Storage tank – Mechanical completion achieved in record time of 213 days for the Vadinar Refinery Expansion project.

Vadinar Refinery Expansion project.

Completion of D1 Development project on fast track basis within record time of 24 months for ONGC, scope of work includes Engineering. Procurement, Construction & Commissioning.