About Us
Inventiveness, international footprint, vertical integration and diversification
Who we are
At the forefront of Heavy Lifts and Engineering
Lifting and handling heavy structures are complex operations. We deliver tailored solutions adapted to each project configuration, from early design to final operation.
Whether occurring during a design-build project or as a primary step to perform repair or maintenance activities, lifting or handling heavy structures remains challenging. It demands control over the stresses induced in the structure throughout the whole process.

Heavy handling includes:
- heavy lifting, which consists in moving a structure or a load vertically,
- sliding, which involves the horizontal shift of a structure or a load,
- rotation sometimes, when the operation also entails a change in orientation of the structure.
vision for the future
about our philosophy
Our Philosophy is to strive to achieve excellence through our competitive pricing, quality services delivered with committed time frame.
We are leading service provider in the Steel and Forging, Power, Automobile, Civil, Petrochemical, Refinery, Ports, Railways, off-shore and On-shore industries in the Indian sub-continents in the following activities.

mission
To be an Indigenous Company with global presence in heavy lift erection & transportation
vision
To assist customers & add value to their businesses by meeting their ongoing requirements for high quality work service – in heavy lift erection & transportation
Values
Creativity | Growth | Service
BENEFITS
Why choose Mudra Heavy Lifts for your project
In the most complex, small and large-scale operations
Reducing installation activities on the critical path
Few interferences with other site activities until the structure is moved and installed in its final position
From concept design to implementation
Minimize disturbance as structures are built next to the traffic line and moved to the final position during a very short track closure
State-of-the-art Hebetec hydraulic equipment and Megasteel® temporary structures
Our Projects
We use proven methods with diligence and innovation with expertise.

Essar Project
As a Heavy lift consultant heavy lift done for Essar Project India Ltd at Durgapur Site. Successfully lifted Co2 absorber ( Dia 6 mtr X 52 mtr weight- 550 Mt ) December 2012- Jan 2013
Sulzer Project
Sulzer bidding work done and site visit for equipment erection in shutdown jobs year -2014-2015.
Sohar Project
Design of all rigging scheme, transportation arrangement, submission of method statement and calculations for Precast H-frame transportation and erection work at Sohar
L&T Bangladesh Project
Road and River (Karnfully River) survey in Bangladesh for L&T power plant through M/s Value Freight (Mumbai) Pvt. Ltd. Year 2015-2016 .