Mudra Heavy lifts are specialized in Erection work. These operations cover on a turn-key basis all operations from the conceptual engineering design provided in-house, through to positioning onto foundation including any lifting and logistics operations.
- Erection of 1000 ton ( 100 m x 7.5 m x 7.5 ) bridge at Dahej with the help of 5000 Mt barge crane . Year -2016-2017
Past Experience in Erection
- Planning & scheduling of erection work and executing the same at Site.
- Erection activities (Static & Rotary Equipments), for CDU/VDU/SGU, CCR/NHT, VBU Unit, FCCU Unit, and ARU/SRU/DHDS/ISOM/VGO/DHDT/DCU, POWER PLANT 600 MW X 2.
- Erected VGO REACTOR L-58 Mtr X W-8 Mtr Xdia 5.5 Mt- 1550 Mt – 03 nos. With Demag CC-12000-1 as Main crane & CC-6800 crane as tailing crane.
- Erected Coker fractionators- L-70 Mtr X 8 Mtr X dia 6 Mtr- 660 Mt with Demag CC-12000-1 as Main crane & CC-2500 crane as tailing crane.
- Erected Splitter column –L-84 Mtr X 8 Mtr X dia 9 Mtr – 500 Mt. Demag CC-12000-1 as Main crane & CC-2500 crane as tailing crane.