SERVICES TAILORED TO YOUR NEEDS - From design to execution
What we Delivering
Delivering results, reliability, & rock solid dependability.
Whether occurring during a design-build project or as a primary step to perform repair or maintenance activities, lifting or handling heavy structures remains challenging. It demands control over the stresses induced in the structure throughout the whole process. Conducting such operations requires engineering expertise, reliable equipment, careful operating, and precise placement.
- From Concept Design to engineering Studies
- Supply installtion of hydrauic Equipment
- Supply Installation of temporary structures
- operations execution
+91 9503186868
Our Services
Planning the most complex lifts
We are leading service provider in the Steel and Forging, Power, Automobile, Civil, Petrochemical, Refinery, Ports, Railways, off-shore and On-shore industries in the Indian sub-continents in the following activities
We possess unique expertise in handling the erection work.
Transportation and erection are related to the process of moving precast components to a building’s site and positioning them to form a structure.
Mudra have expertise in RO - RO operation take glance of our service.
“roll on, roll off”, the vehicle is driven into the transport vessel itself with other vehicles and secured to the deck. Unlike container shipping where the vehicle is placed in a container.
Our professional team is leading us in road survey work with proven expertise.
A road survey is a comprehensive assessment of road infrastructure that provides information about alignment, drainage, safety features, and road geometry.
Like removal of old equipment’s like, exchangers, vessels, elbows, bellows, cyclones and columns and replaced with new ones.
A plant shutdown, also known as a turnaround or outage, is a planned and temporary interruption of operations to perform maintenance, repairs, inspections, or upgrades.
We handle construction of Power plant, Steel plant etc
It consists of an upper carriage mounted on a crawler-type undercarriage. The upper deck and attachments rotate 360º.
FCCU & DHDS, Isomerization, DHDT,CDU/VDU,Visbreaker Unit
The oil and gas industry has developed several methods for installing heavy equipment offshore, including lift barges and floatover installation.
Benefits
Why choose Mudra Heavy Lifts for your project
In the most complex, small and large-scale operations
Reducing installation activities on the critical path
Few interferences with other site activities until the structure is moved and installed in its final position
From concept design to implementation
Minimize disturbance as structures are built next to the traffic line and moved to the final position during a very short track closure
State-of-the-art Hebetec hydraulic equipment and Megasteel® temporary structures
How it works
When you need experience, we have it covered.
We are leading service provider in the Steel and Forging, Power, Automobile, Civil, Petrochemical, Refinery, Ports, Railways, off-shore and On-shore industries in the Indian sub-continents in the following activities
Mobile Cranes and Crawler
We have a vast experience working with all brands of mobile cranes, including tele and strut booms and cranes with and without super lift trays.
Hydraulic Gantry Systems
Jacking and Skidding
Our team have engineered and delivered a range of jacking and skidding operations both on board vessels and on land. Where this is the right solution our engineers can provide a bespoke package for this challenging operation
SPMTs and Trailers
We are experienced and skilled in the operation and planning of working with SPMTs and Hydraulic Trailers. We can provide engineered solutions utilizing these complex but flexible pieces of equipment
Our Expertise
Projects
we appreciate that the planning for every day lifting and transport operations, frequently overlooked and disrespected.
92 mtr. dia. x 20 mtr. Height Crude Storage tank – Mechanical completion achieved in record time of 213 days for the Vadinar Refinery Expansion project.
Completion of D1 Development project on fast track basis within record time of 24 months for ONGC, scope of work includes Engineering. Procurement, Construction & Commissioning.